I'm thinking bad. It's going to be like 30 dispatches an hour at most, which will theoretically mean 720 pph. Half of that will go to FLP. The queue is huge and located out of sight from the midway, so you won't be able to gauge a line length asides from what the app/entrance says (can be wildly off sometimes).
The saving graces are that this is an expansion to park capacity and it being Vekoma means that it's going to operate more consistently than most of the park's major coasters, which between maintenance and hardware have been overly prone to breakdowns. Loose articles out of the way means that train shouldn't be waiting on the brakes for a dispatch.
Not saying that huge lines aren't normal at CP, but honestly that park can be a headache.